Performance by Customer of its collaborative duties in this contract is a primary contractual duty and is a
necessary precondition for the proper performance of SAP’s duties. Customer acknowledges and agrees
that failure on the part of Customer to meet or fulfil any of the specified Customer responsibilities or
requirements in this Agreement might result in a delay in a delay of the provision of the service and/or in the
estimated schedule.
7. ASSUMPTIONS
The following assumptions apply:
• If the quick-start service has not started within two (2) months of the estimated start date as mutually
agreed, SAP has the right to terminate the quick-start service without liability.
• SAP may require up to two (2) weeks to assemble a team. SAP reserves the right not to start the Service
until SAP has assembled a team.
• No more than one (1) business day of workshops will be undertaken during the Explore phase.
• SAP will provide up to four (4) hours of knowledge transfer to project team members.
• No more than five (5) Customer project team members will attend the knowledge transfer workshop.
• SAP will support the Customer with User Acceptance Testing by assisting with test defect resolution. UAT
support is limited to up to five (5) continuous business days which will not exceed one (1) SAP person
days.
• No more than ten (10) Customer persons will execute User Acceptance Testing.
• SAP will assist Customer with the move to the Production environment for up to two (2) SAP person days.
• SAP will provide up to five (5) continuous business days of go-live support to a maximum of two (2) SAP
person days, remotely. Go live support will begin when the technical cutover has been executed by
Customer. Cutover to Production is expected to be executed by Customer within two (2) weeks after
knowledge transfer has been completed. Production validation by Customer is considered part of the
period of go live support.
• Prior to Project closure, Customer will not change any configuration settings since this may interfere with
the Project implementation.
• The project language is English and all documentation will be prepared in English. Project meetings will
be held in English and minutes will be prepared in English.
• SAP may use certain software and tools (all referred to as Tools herein) for its work, for which the rights
are not already regulated through a software license agreement. All title to and rights in Tools, including
without limitation copyright and rights of authorship, remain with SAP or SAP SE. These Tools may be
copied to Customer’s system and Customer is granted non-exclusive rights to use Tools for the term of
and solely for the purposes related to the Service. No other use, including the creation of further copies or
use on another system, is permitted. Tools and all permitted copies of Tools must be deleted at the end of
the Service. If at SAP’s sole discretion Tools are left on the system for documentation purposes,
Customer is not permitted to use Tools for any other remaining purpose except documentation. Such
Tools are on an as-is basis with no warranty. SAP will not support or enhance the Tools beyond what is
provided during the term of the Service.
• All supporting documentation will be developed using personal computers/laptops using Microsoft Office
applications (Word, Excel, MS Project, Visio and PowerPoint) or other mutually agreed documentation
tools.
• For the avoidance of doubt, Customer will primarily be responsible for correcting non-conforming results,
which are related to Customer responsibilities, and SAP will primarily be responsible for correcting
Material Defects, which are related to the agreed SAP scope and activities performed by SAP, provided
that the other party will support when needed.
8. EXCLUSIONS
Any items or services not defined as in scope for this Service are deemed out of scope, including, but not
limited to the following exclusions:
• Measures and/or Dimensions requested outside of the Core Workforce and Mobility Metrics Pack
document.